logo

GMLJP2 1.1 SWG

1. Purpose of the Standards Working Group

The purpose of GMLJP2 v1.1 Standards Working Group is to move the existing GMLJP2 version 1.0.0 standard through a revision process. The SWG will process impacts to this standard from updates of dependent standards, address omissions from the initial standard, process comments from OWS5, and assess future work items for the initial standard. The work of this SWG will also ensure alignment with all OGC processes, the OGC standards baseline, and OGC's business plan.

2. Scope of Work

The SWG will focus on revisions to the existing adopted standard by collecting all outstanding Change Request Proposals, evaluate each of the proposals, and make edits to the standard based on CRPs and related decisions of the SWG membership. The final deliverable of this SWG is an updated version of the candidate standard for consideration by the membership.

Specific items that are currently identified as being in scope may include (subject to approval by SWG membership):

2.1 What is out of scope?

For this activity, out of scope items are defined as:

2.2 Specific Contribution of Existing Work as a Starting Point

The starting point for this work will be:

2.3 How it is to be Determined when the Work of the SWG has been Completed

The following rules define the completion criteria of the SWG:

3. Description of deliverables

The deliverables for this SWG will be:

The preliminary schedule of activities includes:

 

4. IPR Policy for this SWG

This group is set up as RAND-Royalty Free.


5. Anticipated Audience

The anticipated audience of this standard is the community of hardware, software, and systems integration professionals that are involved in image acquisition, rectification, encoding, analysis, presentation, and preservation.

 

6. Other informative information about the work of this SWG


a. Similar or applicable standards work (OGC and elsewhere).


The following standards and projects may be relevant to the SWG's planned work, although none currently provide the functionality anticipated by this committee's deliverables:


The SWG intends to seek and if possible maintain liaison with each of the organizations maintaining the above works.

b. Details of the first meeting

The first meeting of the committee will be held by telephone conference call at 12PM EDT on 8 October 2007. Call-in information will be provided to the SWG's e-mail list and on the portal calendar in advance of the meeting.

c. Projected on-going meeting schedule

The work of the committee will be carried out primarily by email and conference calls, every two weeks, with face-to-face meetings perhaps at each of the OGC TC meetings.


d. Supporters of the Proposal

The following people support this proposal and are committed to the Charter and projected meeting schedule.


e. Convener

Martin Kyle (Sierra Systems) is the convener of the SWG process, believing that it is time for a revision to the adopted standard.




Source URL: http://www.opengeospatial.org/projects/groups/gmljp2-1.1swg



-->